Geosynchronous Satellite Launch Vehicle GSLV Mk IIGeosynchronous Satellite Launch Vehicle (GSLV Mk II) is the launch vehicle developed by India, to launch communication satellites in geo transfer orbit using cryogenic third stage. This is a fourth generation launch vehicle is a three stage vehicle with four liquid strap-nos.
Vehicle SpecificationsHeight 51.73 m (With Ogive PLF) Number of Stages 3 Lift Off Mass 420 tonnes First Flight April 18, 2001 First Flight January 5, 2014
List of GSLV LaunchesSl. No. Satellite Name Launch Date Launcher Type Orbit Payload Remarks 15 GSLV-F12/NVS-01 Mission May 29, 2023 GSLV GTO (Geosynchronous Transfer Orbit) NVS-01 14 GSLV-F10 / EOS-03 Aug 12, 2021 GSLV GTO (Geosynchronous Transfer Orbit) EOS-03 Mission unsuccessful 13 GSLV-F11 / GSAT-7A Mission Dec 19, 2018 GSLV GSAT-7A 12 GSLV-F08/GSAT-6A Mission Mar 29, 2018 GSLV GSO (Geosynchronous Orbit) GSAT-6A 11 GSLV-F09 / GSAT-9 May 05, 2017 GSLV GSO (Geosynchronous Orbit) GSAT-9 10 GSLV-F05 / INSAT-3DR Sep 08, 2016 GSLV-MK-II GTO (Geosynchronous Transfer Orbit) INSAT-3DR 9 GSLV-D6 Aug 27, 2015 GSLV-MK-II GTO (Geosynchronous Transfer Orbit) GSAT-6 8 GSLV-D5/GSAT-14 Jan 05, 2014 GSLV-MK-II GTO (Geosynchronous Transfer Orbit) GSAT-14 7 GSLV-F06 / GSAT-5P Dec 25, 2010 GSLV-MK-II GTO (Geosynchronous Transfer Orbit) GSAT-5P Mission Unsuccessful 6 GSLV-D3 / GSAT-4 Apr 15, 2010 GSLV-MK-II GSAT-4 Mission Unsuccessful 5 GSLV-F04 / INSAT-4CR Sep 02, 2007 GSLV-MK-II GTO (Geosynchronous Transfer Orbit) INSAT-4CR 4 GSLV-F02 / INSAT-4C Jul 10, 2006 GSLV-MK-II GTO (Geosynchronous Transfer Orbit) INSAT-4C Mission Unsuccessful 3 GSLV-F01 / EDUSAT(GSAT-3) Sep 20, 2004 GSLV-MK-II GTO (Geosynchronous Transfer Orbit) EDUSAT 2 GSLV-D2 / GSAT-2 May 08, 2003 GSLV-MK-II GTO (Geosynchronous Transfer Orbit) GSAT-2 1 GSLV-D1 / GSAT-1 Apr 18, 2001 GSLV-MK-II GTO (Geosynchronous Transfer Orbit) GSAT-1
GSLV Mk IIIGSLV M3 is configured as a three stage vehicle with two solid strap-on motors (S200), one liquid core stage (L110) and a high thrust cryogenic upper stage (C25).
Vehicle SpecificationsHeight 43.5 m Vehicle Diameter 4.0 m Heat Shield Diameter 5.0 m Number of Stages 3 Lift Off Mass 640 tonnes
List of GSLV Mk III Launches